Quote:
Originally Posted by Neil
We don't know what schedule 80 is in the UK. Except those of us that have to work on some abysmal American equipment, went to the moon my backside.
|
sorry to disappoint , but have yet to hear of any oil facility,oil or gas line anywhere in the world that has been built to any other pipe standard than the "abysmal American" one .
understand 'metric' sizes are being used on plastic sewer lines and maybe small bore domestic tubing .
