It was reported that the contractor was currently working on the surface water drainage in the area to the east of the junction and also in Haslingden New Road near Greenfield Terrace. As the Haslingden New Road drain would be brought up the carriageway towards the Britannia
Arms it was noted that temporary traffic signals would be required until the works were completed
|
It was months ago that the temporary light were there.
It should have been obvious about the wet conditions. Just to the side of the houses is very often a pond, you can tell by what grows there.
I did notice they had 2 weeks off at Christmas
At this rate that wall will need re-pointing before the roundabout is finished