I know, I know ... at it again ..
11/09/0312 Erection of replacement single storey Former Cliffe Brickworks off 20/07/2009
Aviary/Bird Hospital (Resubmission Cliffe Lane Great Harwood
11/08/0358)
Mr Peter Wall
Is a rebsubmission, turned down due to green belt and laying of hard surface, building and car parking affecting the appearance and visually intrusive outlook. Aaah . bird hospital.
11/09/0317 Full : Change of use of Public House to 181 Blackburn Road 22/07/2009
Retail Shop with living accommodation, Accrington BB5 0AF
installation of shop front, siting of new
entrance door and erection of single storey
kitchen extension at rear
Mrs M Masood
Which pub was this ?
11/09/0319 Erection of 60 metre high meteorogical mast Land on Oswaldtwistle Moor 22/07/2009
for up to a 36 months period Oswaldtwistle
Energiekontor UK Ltd
Eeew hek, lots of objections coming through already.
11/09/0311 Incorporation of land into residential Land to rear of Blossom 17/07/2009
curtilages of 2, 4, 6, 8, 10, 12, 14, 16, 18, Avenue Oswaldtwistle
20, 22, 24, 26, 28, 30, 32 and 34 Blossom Accrington BB5 0FD
Avenue and erection of boundary fencing
The Residents of
Resident of ?
11/09/0295 Change of use from Snooker Club to Use Class Elite Snooker Club Jacob 09/07/2009
D1 non residential education and training Street Accrington BB5 1HU
centre including reinstatement of built up
window openings, replacement of roof
structures and first floor extension to
existing garage with link to main building
to form teaching block (Total 2082m2)
North Lancs Training Group
Another one bites the dust.
2
At paragraph 15 the Inspector concludes “I have found the Council’s decision
to set aside the views of the previous Inspector, and its failure to provide
evidence to back up its decision, to be unreasonable. I consider that together
these actions have resulted in abortive work leading to unnecessary cost, and
I conclude that a full award of costs be made”
The appellant has now submitted a claim for a full award of costs and this is
for £1950. This has been checked and is in the process of being paid. This
has implications for the Planning service as there is no specific budget for
dealing with such matters.
Whilst the Planning Committee is fully entitled to make decisions that are
contrary to officer recommendation members are asked to note that costs will
likely be awarded in the event that the comments of previous Inspectors are
not fully taken into account as part of the decision making process. Given that
applicants can now apply for costs for any type of planning appeal (written
representations, hearings and Inquiries) it is imperative that decisions are
robust, sound and backed up by policies and above all that decision making is
reasonable.
Looks like the Planning Committe got their financial hands slapped here.
Without going into too much detail .. was to do with not making a decision in time and informing the applicant, therefore causing him costs due to the hold up. Was Northlands, Park Road, Great Harwood re. drive and access.