|
General Chat General chat - common sense in here please. Decent serious discussions to be enjoyed by everyone! |
|
|
Welcome to Accrington Web!
We are a discussion forum dedicated to the towns of Accrington, Oswaldtwistle and the surrounding areas, sometimes referred to as Hyndburn! We are a friendly bunch please feel free to browse or read on for more info. You are currently viewing our site as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, photos, play in the community arcade and use our blog section. Registration is fast, simple and absolutely free, so please, join our community today!
|
5Likes
18-09-2012, 10:09
|
#46
|
Full Member
Join Date: Aug 2012
Posts: 228
Liked: 0 times
Rep Power: 3478
|
Re: Oswaldtwistle Moor
Quote:
Originally Posted by MargaretR
|
That probably explains the way I am then. You're right though, they are now recognised as potentially bad for the health.
__________________
These are my principles and if you don't like them------well, I have others. (Groucho Marx)
|
|
|
29-10-2012, 22:51
|
#47
|
Full Member
Join Date: Sep 2008
Location: Oswaldtwistle
Posts: 147
Liked: 21 times
Rep Power: 2979
|
Re: Oswaldtwistle Moor
Putting the blades on the 10th windmill.
The blades.
All 10 windmills
__________________
Golf is a good walk spoilt
|
|
|
29-10-2012, 23:16
|
#48
|
Full Member
Join Date: Dec 2011
Posts: 275
Liked: 7 times
Rep Power: 2568
|
Re: Oswaldtwistle Moor
I was absolutely stunned to see the view of this thing from the playing fields nr Fern Gore shops. They seem to be far larger turbines than those on Scout Moor. They do really over shadow the town now.
My only hope is that they are temporary and in 10 or 20 years time we will have a found a more effective source of energy, nuclear fission or the like, and these can be taken down and the site returned to nature.
However, they have set up a community fund. This doesn't sound like a vast amount of money but if anyone is interested.
Community Fund : HyndburnWindFarm
|
|
|
30-10-2012, 12:57
|
#49
|
Administrator
|
Re: Oswaldtwistle Moor
It is a little early to be applying for funding. Money from the wind farm will not be given to Prospects until the wind farm is producing. The method of application, assessment, monitoring etc is not yet in place.
__________________
Site Forum Rules/ Site Disclaimer can be seen from this link
|
|
|
30-10-2012, 14:41
|
#50
|
Senior Member+
Join Date: Jul 2010
Posts: 2,402
Liked: 715 times
Rep Power: 46613
|
Re: Oswaldtwistle Moor
Good grief, from Spider61s photos they look enormous, the blade lying on the low loaders really shows it.
How high are the erected ones?
|
|
|
30-10-2012, 15:41
|
#51
|
Administrator
|
Re: Oswaldtwistle Moor
They are 80m tall with 42m long blades
__________________
Site Forum Rules/ Site Disclaimer can be seen from this link
|
|
|
31-10-2012, 22:24
|
#52
|
Full Member
Join Date: Dec 2011
Posts: 275
Liked: 7 times
Rep Power: 2568
|
Re: Oswaldtwistle Moor
Quote:
Originally Posted by Neil
They are 80m tall with 42m long blades
|
I call them the Ossy Triffids.
|
|
|
12-12-2012, 18:19
|
#53
|
Full Member
Join Date: Sep 2008
Location: Oswaldtwistle
Posts: 147
Liked: 21 times
Rep Power: 2979
|
Re: Oswaldtwistle Moor
__________________
Golf is a good walk spoilt
|
|
|
12-12-2012, 18:25
|
#54
|
Senior Member
Join Date: Mar 2004
Location: Accy
Posts: 1,623
Liked: 158 times
Rep Power: 6038
|
Re: Oswaldtwistle Moor
Love that 2nd pic.
|
|
|
12-12-2012, 18:55
|
#55
|
Senior Member+
Join Date: Feb 2010
Location: In the Dog House
Posts: 3,885
Liked: 3313 times
Rep Power: 41695
|
Re: Oswaldtwistle Moor
Them Windmills have a lot to answer for
|
|
|
12-12-2012, 20:08
|
#56
|
God Member
Join Date: Aug 2007
Location: Northern Italy
Posts: 4,419
Liked: 1866 times
Rep Power: 26227
|
Re: Oswaldtwistle Moor
Quote:
Originally Posted by Spider61
|
Very eery - they have me thinking of alien invasion!
__________________
“Beauty is an experience, nothing else. It is not a fixed pattern or an arrangement of features. It is something felt, a glow or a communicated sense of fineness.” ~ D. H. Lawrence
|
|
|
12-12-2012, 20:41
|
#57
|
Senior Member
Join Date: Feb 2008
Posts: 1,877
Liked: 26 times
Rep Power: 3766
|
Re: Oswaldtwistle Moor
Windfarm from Holden Wood, Duke of Wellington mid photo
|
|
|
22-12-2012, 00:39
|
#58
|
Junior Member+
Join Date: May 2008
Posts: 18
Liked: 0 times
Rep Power: 0
|
Re: Oswaldtwistle Moor
Quote:
Originally Posted by ToffeeGuy
I was absolutely stunned to see the view of this thing from the playing fields nr Fern Gore shops. They seem to be far larger turbines than those on Scout Moor. They do really over shadow the town now.
My only hope is that they are temporary and in 10 or 20 years time we will have a found a more effective source of energy, nuclear fission or the like, and these can be taken down and the site returned to nature.
However, they have set up a community fund. This doesn't sound like a vast amount of money but if anyone is interested.
Community Fund : HyndburnWindFarm
|
Forgive me if this is aired somewhere else, but, the actual amount will be £100,000 per year for the next 25 years and is not dependant on the amount of electricity actually produced. Its based on the theoretical capacity of each turbine.
With match funding from other sources this means a total income of £5,000,000 for Prospects over the next 25 years.
There seems to be a silence on how this largesse will be allocated around the Borough. The turbines are turning so, one assumes, the cash will shortly be bolstering Prospects bank balance.
There is also silence on how Prospects were selected to receive this money.
|
|
|
22-12-2012, 14:29
|
#59
|
Administrator
|
Re: Oswaldtwistle Moor
Quote:
Originally Posted by greatharwood
Forgive me if this is aired somewhere else, but, the actual amount will be £100,000 per year for the next 25 years and is not dependant on the amount of electricity actually produced. Its based on the theoretical capacity of each turbine.
With match funding from other sources this means a total income of £5,000,000 for Prospects over the next 25 years.
There seems to be a silence on how this largesse will be allocated around the Borough. The turbines are turning so, one assumes, the cash will shortly be bolstering Prospects bank balance.
There is also silence on how Prospects were selected to receive this money.
|
This is the wrong place but seeing as you asked I will try and help.
No silence on how Prospect were selected, Energie Kontor have posted the information here Community Fund : HyndburnWindFarm. As far as I know they approached The Prospects Foundation several years ago and invited them to submit a proposal for a community fund.
The actual amount will not be £100,000 a year. It is index linked and could increase each year.
No idea where you come up with the figure of £5 million income for prospects. If you read the link I posted it explains that money will be available for local groups to apply for. When and how that bidding process will work has not yet been decided.
If you want any more information I suggest to contact the charity manager on this page http://www.prospectsfoundation.org.u...age=contact-us
__________________
Site Forum Rules/ Site Disclaimer can be seen from this link
Last edited by Neil; 22-12-2012 at 14:31.
|
|
|
23-12-2012, 00:37
|
#60
|
Junior Member+
Join Date: May 2008
Posts: 18
Liked: 0 times
Rep Power: 0
|
Re: Oswaldtwistle Moor
Neil,
Regarding the £5m, I was taking into account match funding that would be available from other sources. I'm sure you are aware that this is how many charities accumulate funds to do their work. So £100,000 x 25years = £2.5m + £2.5m (match funding) = £5m.
Energiekontor quoted the £100,000 figure in their Project Update April 2009, a figure which has not been disputed by Energie or Prospects when it has appeared in the local press, This equates to £3,500 per installed megawatt (i.e.the design capacity of the turbine, not the actual amount of power supplied.)
As you say there is an annual inflation increase written into the agreement, so we could say Prospects have the prospect of a steady annual income which over the next 25 years will have totaled £5m + inflation.
I may have missed it, but I query whether any other organisation, along with Prospects, was considered to oversee the spending of this significant amount of community money.
Of course this will be indirectly added to all our electric bills, but I don't think we need to go down that road on this thread.
|
|
|
Other sites of interest.. |
More town sites.. |
|
|
All times are GMT. The time now is 12:22.
© 2003-2013 AccringtonWeb.com
|
|