Pitch

Will they have to install some steps to get on/off the pitch on the far left corner :-) (looking from clayton end)
Posted via Mobile Device
 
Grandad was down today, said they are all new irrigation ditches being dug with pipework the full length of the pitch.
 
Its hardly recognisible now lol, hopefully we will have a great pitch and hopefully hold up more better in winter:D good stuff.
:)Drains are in sprinkler system in top soil is on and was exspected to be re-seeded over the wkend.so we should have a green pitch in 2wks time:) ps i have more pics but wont let me upload them:(
 
Cheers for the pic Mab:)

It's already changed a lot since I was over there about 1 & half ago, looking forward to seeing the finished pitch:)
 
:)Drains are in sprinkler system in top soil is on and was exspected to be re-seeded over the wkend.so we should have a green pitch in 2wks time:) ps i have more pics but wont let me upload them:(
How long will it be before it can be played on, the season will be staring in about 8 weeks time!!
 
Well pitch is definately different and had a nice farm pong wiff over the crown ground lol ready to be seeded within next few days.
Posted via Mobile Device
 
Burnley have today moved their home friendly on July 31st to Huddersfield because they don't think the new pitch will be ready. Will be interesting to see how quick Stanley's pitch will grow, I reckon they are on about the same time process.
 
Burnley have today moved their home friendly on July 31st to Huddersfield because they don't think the new pitch will be ready. Will be interesting to see how quick Stanley's pitch will grow, I reckon they are on about the same time process.


I am sure we will contniue to get regular updates from he club,and pictures of progresss:confused::confused:
 
I am sure we will contniue to get regular updates from he club,and pictures of progresss:confused::confused:
Down yesterdy!pitch has been lazer leveled and has had ton's of smelly stuff ploughed in and is ready for seeding.sprinkler system is installed and fully working as tests have been made thursday and friday,their is work going on over where the old toilets were at the coppice end:)
 
Back
Top